"No change to the levee design is needed." That sentence sits on page 11 of the Revised Environmental Impact Report that the California Department of Fish and Wildlife released for the Ballona Wetlands Restoration Project, and it sums up the whole document. The public comment period opened October 23 and closes at 5:00 p.m. on December 7, 2026. The one in-person meeting is tonight, Thursday, November 12, a short drive up Manchester Avenue.
If you live in Playa del Rey, the wetlands are the open ground between your street and Marina del Rey. The plan out for comment is essentially the plan approved in 2020, with one engineering figure re-analyzed. The trails, the bike path and the public-access pieces you would actually walk on are drawn the same way as before. The best way to understand what's being decided is to walk the ground yourself, and over the next four weekends that's unusually easy to do.
One number, reopened by a court
CDFW certified the original Final EIR on December 30, 2020. A Los Angeles County Superior Court judge ruled on challenges to it on May 17, 2023. CDFW won on nearly every point. The court did require the department to disclose and analyze new flood control design parameters, and to commit to more environmental review if performance criteria change. CDFW decertified the EIR on September 28, 2023, and started revising it under that order.
The revision is that narrow. The new report, dated September 2026, sets the design flow for Ballona Creek at 68,000 cubic feet per second. The 2020 document used 46,000. To support the higher figure, the report adds new analysis of hydraulic modeling, flow velocity, water-surface profiles, scour, sediment transport, and effects upstream and downstream. Its conclusion, based on a new hydrology addendum, is that the levees as already designed can handle the larger flow. So the report doesn't revisit the 2020 analysis of biological resources, aesthetics, or soil excavation. The report also says its analysis found no new potentially significant impacts compared with the 2020 Final EIR.
The report adds two smaller clarifications. It spells out that the preferred alternative will be built in two phases, each with multiple sequences. And it commits CDFW to supplemental environmental review before relaxing performance criteria or scaling back restoration goals.
What stays exactly as drawn
The project still covers 566 of the Ecological Reserve's 577 acres. Those 577 acres are what's left of a marsh, mudflat and dune system that once covered about 2,000 acres, from Playa del Rey to Venice and inland to the Baldwin Hills. The revised report proposes no changes to the public-access and visitor-facilities sections. The sequence table shows what that means near Playa del Rey:
- Phase 1, Sequence 4: a new pedestrian and bicycle bridge across the channel, with the bike path rerouted to pass under it.
- Phase 1, Sequence 18: two new box culverts, one on Culver Boulevard and one on Jefferson Boulevard, plus a realigned outlet for the Freshwater Marsh.
- Phase 1, Sequence 22: a fire access road and a rebuilt parking lot in West Area B.
- Phase 1, Sequence 23: a bicycle path, pedestrian walk and amenities along the top of the levee.
- Phase 2, Sequence 30: an extension of the bicycle path along the top of the south levee to Playa del Rey, with amenities.
That last item is the one that ends in this neighborhood, and it sits in the second phase of a two-phase plan.
A plan with no construction date
Clearing the comment period doesn't start construction. The department says restoration depends on avoiding further litigation and on available funding. It also needs several permits first, including one from the U.S. Army Corps of Engineers to modify the Ballona Creek channel and levee system. CDFW will pursue that permit with the Los Angeles County Flood Control District. It says it cannot predict when the permit will be issued and expects to submit the application within the next two years.
That timing explains why the outcome of this comment period matters. A Phase 2 bike path to Playa del Rey comes after an Army Corps application that hasn't been filed yet. The plan as written is the one that will govern whatever does get built, so the next four weeks are the window when the public record on it is open.
Tonight on Manchester, and the three ways to comment
CDFW's public noticing meeting covers what the report contains and how to submit comments. It runs from 6:00 to 7:00 p.m. tonight at the Westchester Municipal Building, which houses the LA City Council District 11 office, at 7166 W. Manchester Ave.
According to the CDFW project page, written comments must arrive by 5:00 p.m. on December 7. There are three ways to send them:
- Mail to California Department of Fish and Wildlife, Attention: Ballona Wetlands Restoration Project REIR Comments, 3883 Ruffin Road, San Diego, CA 92123.
- Email to [email protected], with "Ballona Wetlands Restoration Project REIR Comments" as the subject line.
- An online comment card, for five or fewer comments, linked from the same page.
The Notice of Availability and the full Revised EIR are posted there too. The sequence table described above starts on page 21 of the Revised EIR.
Every weekend of the window has a way in
Most of the reserve isn't open to wander. During the comment period, though, Friends of Ballona Wetlands and CDFW have scheduled something every weekend, plus a few weekday afternoons. Most require advance registration through the organizer, and the November 28 trail work takes sign-ups on site.
| Date | Event | Time | Meeting point |
|---|---|---|---|
| Fri, Nov 13 | Freshwater Marsh Tour | 10 a.m. to noon | Ballona Discovery Park, 13110 Bluff Creek Dr. |
| Sat, Nov 14 | United Ballona Creek Cleanup | 9:30 a.m. to noon | 303 Culver Blvd. |
| Sun, Nov 15 | Birding with Bob | 8 a.m. to noon | Del Rey Lagoon west-side lot, 6520 Pacific Ave. |
| Fri, Nov 20 | Habitat restoration | 3 to 5 p.m. | 303 Culver Blvd. |
| Sat, Nov 21 | Habitat restoration | 9:30 a.m. to noon | 303 Culver Blvd. |
| Sun, Nov 22 | Freshwater Marsh Tour | 10 a.m. to noon | Ballona Discovery Park, 13110 Bluff Creek Dr. |
| Sat, Nov 28 | Invasive-plant removal, Fiji Trail | 9 to 11 a.m. | 13730 Fiji Way |
| Fri, Dec 4 | Friday Habitat Restoration | 3 to 5 p.m. | 303 Culver Blvd. |
| Sat, Dec 5 | Freshwater Marsh Tour | 10 a.m. to noon | Ballona Discovery Park, 13110 Bluff Creek Dr. |
The Sunday birding walk is the closest to home. It meets at the Del Rey Lagoon lot and covers the lagoon, Dockweiler Beach, the breakwater and jetty, and the Ballona Creek estuary. That's the stretch the south-levee bike path in Sequence 30 would eventually reach. The Culver Boulevard sessions at 303 Culver put you along the road where the plan calls for over-excavation and the new Culver Boulevard levee in North Area B. The December 4 session also requires a digital waiver. CDFW notes that items on its calendar can change, so check the listing before you head out.
Two ways in without a reservation
If you'd rather walk on your own time, the Fiji Trail lot is open to the public for self-guided walking from 8 a.m. to 1 p.m., Wednesday through Saturday. The West Culver parking lot, behind the business at 301 Culver Boulevard, opens only for guided events and doesn't allow overnight parking.
The November 28 invasive-plant removal on the Fiji Trail is the one event on the list you can just show up for. Volunteers sign up on site at 13730 Fiji Way, and parking is free on a first-come basis. It falls on the Saturday after Thanksgiving, nine days before comments close.
After more than 40 years in the South Bay, I still think the Ballona Wetlands are one of the best things about living on this stretch of coast. If you'd like to talk about Playa del Rey, or about how a project like this one shapes the streets around it, reach out to Bill Ruane. Let's Connect.